Summary: CCBAC implemented a comprehensive control and monitoring solution for the 499 Forbes laboratory, a 5-story facility with stringent safety and operational requirements. The project included control of a 200,000 CFM air handler, 24 supply fan VFDs, modulating boiler and chiller systems with lead/lag pumps, four high-capacity exhaust fans for hazardous fume removal, 106 fast-acting VAVs, exhaust VAVs, and fume hoods, along with integration to a Samsung VRF system, DOAS unit, gas manifold systems, booster and vacuum pumps, an air compressor system, generators, and power monitoring to ensure safe and efficient laboratory operations.